| Its rainy and very dark today so Mike bought some headlights. |
| The light is especially necessary here. |
| The top corner fits perfectly though no one will really get a good view of it! |
| End of day 7! |
MOSAIKA IS HAPPY TO BE BACK IN NEW YORK CITY INSTALLING A MOSAIC FOR THE NEWLY RENOVATED SMITH AND NINTH SUBWAY STATION IN BROOKLYN. THE ARTWORK, BY BROOKLYN BASED MULTI-MEDIA SCULPTURE ARTIST ALYSON SHOTZ, DEPICTS THE LONGITUDE LOCATION OF THE STATION AND IS MADE OF HAND GLAZED TILE, ALUMINUM AND STAINLESS STEEL.
| Ferrucio uses clamps instead of his hand to hold down the stainless steal bars because they get very hot when cut. |
| They even melted the rubber! |
| You can peak outside between the beam and the wall. |
| And Mike can peak at us! |
| It's difficult but Mike finds a way to trowel behind the electrical conduit. |
| End of day 6! |
| We got new scaffolding today so we can finally start working at the very top. |
| We have to cut our mosaic to fit the iron clips attached to the top beam. |
| To make the wall an even surface for the mosaic, Mike has to put a skim coat of cement on the wall. |
| The door is always open but you can never leave! |
| End of day 5! |
| Our track safety course took everyone in the class on a field trip. |
| Nina, do not enter or cross tracks! |
| A view of the train from the tracks, a first for us. |
| After passing the safety course, it's now time to start work! |
| We begin by installing a temporary bottom ledge for our mosaic since the floor is not poured yet. |
| Nina starts the day with an important phone call and a to do list. |
| Once the wood is removed, the mosaic will be sitting in a nice frame. |
| The wall needs lots of work before we can install, like chiseling and scraping down high spots and filling in holes and leveling with cement. |
| End of day 1! |